Our Travels

Our travel blog and trip guide

Our-travels.com is currently being build and expected to be ready mid July 2024

Switzerland

Travel activity type is visiting a sight

The Emosson dam

-

This page describes a travel activity idea  based on info found elsewhere and contains incomplete & unstructured information.  This travel activity idea will later be converted into a travel activity article.

15 June 2024

Our Travels Admin
Difficulty is unknownDistance is unknown??? kmAscend is unknown??? mtrDescend is unknown??? mtrDuration of the travel activity is unknown??? - ???Unknown if a cable car has been usedGPX track not availableUnknown if travel activity has been done by us

Guided tour of the Emosson dam

The Emosson dam, built between 1969 and 1973, is the keystone of a major hydroelectric complex straddling Switzerland and France.
Two hydroelectric power stations provide almost 3% of the electricity produced in Switzerland. Hydroelectricity is an indigenous, storable, flexible, renewable and CO2-free energy.
With its 225 million m3 of water, Lake Emosson is the 2nd largest artificial reservoir in Switzerland.

https://www.valleedutrient.ch/fr/visites-guidees-du-barrage-d-emosson-fp591

https://emosson.ch/

https://www.valleedutrient.ch/fr/barrage-d-emosson-fp358

https://www.valleedutrient.ch/fr/emosson

Other dam: https://www.valleedutrient.ch/fr/barrage-du-vieux-emosson-fp359

Other dam: https://www.valleedutrient.ch/fr/barrage-de-barberine-fp360

 

dessin-VerticAlp2023-FR

 

 

 

 

Article by <a href="https://our-travels.com/author/otravadmin/" target="_self">Our Travels Admin</a>

Article by Our Travels Admin

Position

Writen by the website owner

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *